Specify
The setting, stone, metal, ring size, finish, engraving, and measured details are recorded in one versioned specification.
Model and approve
The factory creates the authoritative CAD model and approval renders. You review the exact revision before production can begin.
Make and document
Casting, setting, finishing, quality control, certification, packing proof, and shipment are recorded on the order timeline.
How long it takes
As a planning guide, specification and CAD review take two to three weeks, and the time depends largely on how quickly revisions are reviewed. Production, setting, finishing, quality control, and certification take a further four to six weeks. Insured transit is additional.
Those are guides, not commitments. Where you have a fixed date, we work backwards from it, confirm the schedule with the factory against current capacity, and tell you before you pay whether the date is achievable.
What arrives with the piece
Each order is dispatched with the grading report for the center stone, a specification sheet recording the approved revision, and the final inspection record made before packing.
- The independent grading report for the center laboratory-grown diamond.
- A specification sheet listing metal, measurements, accent details, and the approved CAD revision.
- The final inspection video and the packing proof tied to the shipping label.
- A presentation box, a travel pouch, and written care guidance.